Welcome to visit Newtec Power Equipment Co. Website!E-mail:lukegenset@gmail.com;Skype:lukeliuhui Newtec: Espanol Newtec: Portugues Newtec: Russia Newtec: Francais Newtec: Arabic Newtec: Italiano
24 Hour Hotline:+86-18086765913
Home > News > Technical Articles
Classification List

Contact/ Newtec

Contact:Luke Lau
Phone:+86-18086765913
Tel:+86-18262338970
Fax:+86 523 86338688
Address:Taizhou, Jiangsu, China
Skype:lukeliuhui
lukegenset@gmail.com

Detailed Content

How to do Proper Maintenance

Author:Newtec Power  Date:2014-05-23 22:10:13

Safety Rules

Importance of Safety Cautions and Necessary Conditions

 

Please read this instruction manual before operating the generator set (Generator) to obtain know-how on the rules and equipment referred to in this manual. Ensure that the installation and running-in of the Generator are done in conformity with the instructions,and the operation and maintenance staff is skilled, responsible and experienced. Disobedience of the instructions and safety rules may cause severe results such as halt of the equipment, mechanical damage, personal injury and other nnecessary losses. AOSIF Generator is designed to ensure safe operation, however it can’t be operated safely if the operation and maintenance staff on the worksite ignore the precautions and procedures as described in this manual.

 

 

Electrical Hazard Warning

1.The generator can only work on loads that correspond to its electric parameters and rated power output. Overload is prohibited.

2.National and international electric regulations are applied. Electricians must obtain   appropriate professional qualifications before they install any electrical equipment. When the switch is in “ON” position, a sign must be used in obvious position to indicate such status to avoid accidents.

3.Do not connect the Generator directly to the power supply system of the building. Electric shock may occur or the Generator may be damaged by sudden turbulent in the municipal power line. The Generator should only be connected to the municipal power system through a safeguarding switch.

4. Appropriate neutral line grounding  must be done in order to prevent a sudden voltage surge or undetected grounding faults.

5. The following measures shall be taken to avoid electric shock:

a. switch off the power supply when protections are removed or work is carried out on an electric equipment;

b. when approaching electric equipment, do not set foot on metal or wet cement ground around the equipment. Lay dry wood pads on the ground and cover it with rubber insulation sheets;

c. do not touch electric equipment with wet skin or wet clothes/shoes.

6. Be extremely aware of the danger of working on electric objects. High voltage electricity may result in severe injury or death. Do not change the lock devices discretionally.

7. Before running the generator, check the insulation resistance of the output cable with a 500V megohm meter. Ensure that the resistance value is no lower than 2 M.